| Fault Code | Potential Trigger | Diagnostic Approach |
|---|---|---|
| 1E (or OE) | Water Evacuation System Obstruction |
– Examine drainage pathway. – Sanitize filtration system. – Verify disposal unit clearance. – Perform system reset. |
| 1C (or 1E) | Liquid Supply Infrastructure Disruption |
– Verify liquid supply valve status. – Inspect intake conduit for obstructions. – Clean intake filtration mechanism. – Validate domestic liquid pressure. |
| 3E | Propulsion Mechanism Malfunction |
– Evaluate electrical interconnections. – Examine pump impeller for impediments. – Consider mechanism replacement. |
| 4E | Thermal Regulation Anomaly |
– Assess thermal conversion element. – Validate temperature monitoring system. – Confirm thermal supply integrity. |
| 5E | Systemic Communication Disruption |
– Reinitialize system. – Examine electrical junctures. – Consider central control module replacement. |
| 7E | Liquid Volume Detection Malfunction |
– Sanitize volume detection sensors. – Verify liquid flow dynamics. |
| 8E | Dispensing Mechanism Irregularity |
– Clear dispensing pathway. – Comprehensively inspect dispensing unit. – Replace if systematic failure detected. |
| 9E | Liquid Containment Breach |
– Examine sealing membrane. – Verify conduit integrity. – Ensure structural horizontal alignment. |
| AE | Auxiliary Communication Disruption | – Apply 5E diagnostic protocol. |
| bE | User Interface Interaction Disruption |
– Examine and sanitize interface controls. – Replace control interface if necessary. |
| dE | Access Mechanism Misalignment |
– Verify complete mechanism engagement. – Inspect switch and locking mechanism. |
Click to rate this post!
[Total: 0 Average: 0]